29.3 C
New Delhi
July 22, 2026
National NewsNews from StatesSlider

Mumbai–Ahmedabad Bullet Train Project to Go Live by 2029, Says Ashwini Vaishnaw

https://twitter.com/i/status/2022641272465559970

New Delhi, Sept 27: Mumbai’s bullet train connecting to Ahmedabad is set to be operational by 2029, with a 50-km section between Surat and Bilimora opening in 2027.

Union Railways Minister Ashwini Vaishnaw stated that travel time will reduce to two hours and seven minutes from nine hours. The project utilizes modern safety technologies and aims for high train frequency. The overall length of the corridor is 508 km, and future plans include four additional bullet train corridors across India.

Related posts

Back to top