Itanagar, Sept 04: The 6th Steering Committee Meeting to review and monitor the progress of the 13 Hydroelectric Projects allotted to various CPSUs such as NHPC Limited, NEEPCO Limited, SJVN Limited & THDC Limited in Arunachal Pradesh was held at Itanagar on 3rd September, 2024. The Meeting was held at Chief Minister of Arunachal Pradesh’s Residential Office, Niti Vihar, Itanagar.
The Meeting was presided over by Pema Khandu, Chief Minister of Arunachal Pradesh in the presence of Raj Kumar Chaudhary, Chairman & Managing Director, NHPC Limited and Mohammad Afzal, Joint Secretary (Hydro), Govt. of India. The meeting was held to resolve the critical issues faced by the 13 Hydroelectric Projects allotted to various CPSUs in Arunachal Pradesh.
Pema Khandu, Chief Minister concluded the meeting with the assurance of all possible support and cooperation of the Govt. of Arunachal Pradesh for fast tracking the onset of above projects.




